Vision Development were contracted to build the timber frame structure for a stunning contempory design house on the side of the river Thames near Wargrave in Berkshire (between Reading and [...]
The scaffolding on the first house has now come down and Vision Development’s work on that house has been completed. Here are some pictures of the outside of the house showing the [...]
Vision Development, timber frame suppliers and builders of Newbury in Berkshire have set up our own YouTube channel to show the ease and advantages of this method of building. You can find our [...]
The work continues with much being done inside both houses including plastering, heating and ventilation work. Of particular note are the energy saving solutions that are being installed which, [...]
Despite the continued appalling weather, much progress has been made during May. The first house has had the outside bricks put in place and much inside work completed. The second house has had [...]
Once again, despite the weather, much progress has been made during April. Here are the results of two photo shoots taken one week and three weeks after the last installment. This shows not [...]
Now the foundations are in place the timber frame panels are put in place (for both upstairs and downstairs). Also added are the internal partitions and the upstairs floor. This entire process [...]
The levelling of the ground and excavations for the foundations not only requires a lot of digging but also creates a lot of surplus soil which has to be moved. The foundations are dug as deep [...]
Vision Development are building two timber frame houses, near Reading in Berkshire, for a self build client. One of these houses will be the clients’s home and the other is for development [...]
The cost to build a timber frame house of course varies according to the individual specification. Here is a budget guide for a design and build service (in which Vision Development will manage [...]