Following the timber frame kit house installed at the same site address, we also manufactured and installed a Gospel Hall with similar design and finishes.
A workplace designer asked us to produce a timber frame structure that would suit their preliminary designs for a showroom building within a commercial unit.
Vision Development are currently undertaking the timber frame installation of a new early years classroom block at The Yarrells Preparatory School, Poole.
The new Goring Heath Veterinary Surgery is a super eco efficient (solar panels, MVHR and air tight)timber frame construction built by Vision Development.
Those that want the ultimate in quality, energy efficiency and speed of construction should consider the advantages of building with our Closed Panel Timber Frame system. These panels can be [...]