Update on the 4 Luxury Homes in High Wycombe
On our last blog for this development in the rolling countryside of the Chiltern Hills, we had completed the installation of the timber frame for both plots one and two and the steels for plot three were due to be installed ready for the ground floor panels to be delivered and fitted. Read more on the first two plots here in our earlier article on this High Wycombe development.
By mid-July house three had been installed and the groundworks had commenced for house four which was due to be manufactured in August 2018. The timber frame panels were delivered to site on the 11th September and by the 28th September, the house was installed, that is a total of 13 working days and the house is then ready for roofers and external cladding to be installed.
To get a better feel for the layout of the site for these 4 new luxury homes, below is a CGI created to show the creative and modern designs of the homes as well as their complete looks.
As the builds are completed externally we will post photos onto our social media pages so follow our Facebook Page for more updates.
If you are a builder or developer and would like to find out how you can speed up your projects, as well as making them more cost effective, please give us a call on 0118 971 2181 or send us an email.
If you would like to speak with Vision directly regarding your own development of homes for sale on the open market, or are even interested in a joint venture, please contact us directly on 0118 971 2181 or email us at info@vision-dsl.com.