The new build home (shown above) for our Clients in Sunningdale, Berkshire was manufactured using our closed panel system. The panels were delivered to the site in an articulated lorry and off-loaded using a 40 ton crane. Each individual panel was lifted into place, directed by our on-site signaller and then fixed together by our on-site erectors.
You will see below from the photos the sequence of when the panels arrive to when they are assembled and the home once all the external finishes are complete.